P1 C 76021880 01

Phase One

Akurat Lighting - Phase One D8 R+ LED Panel

$4,125.00

Manufactured exclusively for Phase One by Akurat Lighting.

Featuring extremely high quality LEDs coupled with even diffusion, the D8 R+ LED Panel has a CRI value >98 at 100% brightness.

The D8 R+ LED Panel produces flicker free lighting suitable for any high end digitization project where even lighting and color accuracy are paramount.

Product code P1C-76021880

Key benefits and features

  • Flat LED panel with extremely even illumination
  • Excellent color accuracy - CRI >98 at 100% brightness
  • Flicker free – LEDs powered by direct current with no ripples
  • Easy to handle, with angled yoke bracket for easy tilting of the panel
  • Excellent diffusion
  • Panel size 540x330mm
  • Overall size 680x390mm
  • Durability of LEDs – 50,000 hours
  • Weight including AC adapter, yoke and mount – 5.5Kg
  • Limited three year manufacturer warranty included
  • Optional Accessory Kit includes barn doors and honeycomb grid

The Future of Color Rendition – the Standard? TM-30 was introduced with the intention to provide a new way of measuring light fidelity and help users analyze the color characteristics of both modern and traditional solid-state light sources. This brings greater fairness and accuracy of the measurement.

More on TM-30 standards:
TM-30-18 is a new IES standard for reviewing and selecting color for LED lights. TM030-18 creates a test color sample from 99 different colors and reports the 99 results categorised into hue bins that are shown in a 16-section Color Vector Graphic.

TM-30-18 Rf is the Fidelity score. Unlike CRI referencing the sun from 9 color reference points, Fidelity (Rf) references a perfect reference color, with a score of 100 being an exact match to the reference color.

With a TM-30-18 Rf score of 98, the Phase One D8 R+ LED panel rates highly.

TM-30-18 Rg is the Gamut score. The Gamut (Rg) score references color saturation and allows for scores to exceed 100 reflecting an increased saturation of color when a Gamut (Rg) score exceeds 100. Gamut (Rg) scores can range from 80 to 100 to reflect under or over-saturation of colors.

TM-30-18 is likely to replace CRI as a measure of light quality in future, but for now, both remain relevant.

Needless to say the scores for the D8 R+ LED panel are excellent regardless of the measurements used, as shown in the white paper below.

Unios TM-30: The future of measuring colour in lighting - White Paper
Phase One D8 R+ White Paper
Phase One D8 R+ User Guide

Colour rendering index CRIRa>98
Television lighting consistency index TLCI99-100
Angle of beam90°
Dimming (%)50-100 Adjusted in increments of 2%
Corelated colour temperature CCT2700K/6500K Tungsten (+/-150K) /daylight (+/-300K) adjusted in increments of 50 Kelvins
Average illumination @1m3600 lux @ 6500K , 3000 lux @ 2700K
Average illumination @1.2m2500 lux @ 6500K , 2080 lux @ 2700K
Average illumination @1.8m1100 lux @ 6500K , 920 lux @ 2700K
Average illumination @2.4m620 lux @ 6500K , 500 lux @ 2700K
Average illumination @3.0m400 lux @ 6500K , 320 lux @ 2700K
Average illumination @4.0m220 lux @ 6500K , 180 lux @ 2700K
FlickeringFlicker free
Nominal voltageC12-18V
Max power (W)130/120 AC/DC source
Power sourceAC 90-264V. V-Lock or Gold Mount battery plates ordered separately
Remote controlDMX, W-DMX Wireless W-DMX as an option, ordered separately
Amount of light sources (LEDs) (pcs.)480. Middle power SMD
Cooling systemPassive
Operating ambient temperature-10 to 40°C
Storage ambient temperature-40 to 80°C
Max. ambient humidity85%
Durability of LEDs50,000 hours
  

Join the Specular Mailing List

Get the latest industry information, including exclusive tips, news and more.

Christmas 2024 & New Year 2025 opening information


Sydney

The showroom will close at 5pm on Friday December 20th, and open again on Monday 6th January 2025.

Melbourne

The showroom will close at 1pm on Tuesday December 24rd, and open again on Monday 6th January 2025.

Online Orders

Our pre-Christmas order cut-off is Monday 23nd December. All online orders after the cut-off will begin shipping from Monday 6th